A new Combined Cycle Gas Turbine (CCGT) power plant was constructed on a brown field site beside the existing SKS Prai power plant in Prai, Butterworth, Penang in Peninsular Malaysia. The Plant shall be designed for dual fuel firing, whereby natural gas (“Gas”) is assumed to be the primary fuel and distillate oil the secondary fuel (“Back-up Fuel”).

The scope of work included design, manufacturing, testing and supply of a two stage fuel oil (Distillate Oil) treatment system: one, a filtering skid and the second, a coalescing skid. Both skids were on a one working, one standby design (duplex type) complete with instrumentation and interconnecting piping for plug and play at site.

Check all our solutions for Power Generation.

Comments are closed.

Sungov Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.